Tag Archives: dinghy

Wash down pump replacement

Servicing our Girl: Sugar Shack

What do you do on a beautiful day in paradise?  Get dirty?  We had a few boat projects that needed to be completed in calm weather (no wind and no swell).  So, we set out to do some maintenance and servicing of both Sugar Shack and Sweetie (our dinghy). 

Anchored in calm waters with very little breeze made it much easier to accomplish these specific projects.  We dropped the hook at North Totegegie where we had beautiful views. 

Servicing the Boat in Paradise

Servicing the Boat in Paradise

Windlass Service

What is a windlass?  It is an electric wench that raises and lowers our anchor and anchor chain. It is a very important part of our boat as it would make anchoring nearly impossible without it.  In a pinch, we can manually raise and lower our anchor using the hand crank method.  However, we have 100 meters of 10mm stainless steel chain attached to a Spade x140 anchor that weighs in at over 65lbs.  Imagine cranking all that chain and anchor up by hand – no thank you!

Our Lewmar Ocean 3 windlass (2000 watt) was running a little slow when raising the chain.  Once it got going it was fine, but the startup was less than optimal.  Not a problem, just needed a little love.  We are at anchor with our anchor chain connected to the windlass.  Can’t rightly service the windlass without removing the anchor chain, right?  First things first, Matt ties a line to the last link of chain (just at the rode) and then secures it to the anchor roller so he could remove the pressure off the windlass.  Then he jumped in the hole (locker) and cleaned the brushes and removed the corrosion.

Servicing the Windlass

Servicing the Windlass

Not yet at 100%…it might require a more comprehensive servicing in a month or two.  For now, it is better than it was and that is good for us (maybe at 95%).  A few days later, Matt took the windlass apart and cleaned all the connections.  He found a loose wire that was the culprit and now the windlass is running perfectly!

Tail Tails

Do you know what a tail tail is?  It doesn’t have anything to do with your posterior or an animal.  A tail tail on a boat is an indicator of how your sails are trimmed while underway.  They are small, light pieces of fabric attached to the sail.  When the sail is trimmed correctly, the tail tails on the windward (inside) and leeward (outside) of the sail will stream backwards.  That’s when life is good.  If the sail needs trimming the tail tail will either fly up or down indicating the need to tighten or loosen the jib sheet (working line) to give you optimal performance.

Our tail tails were very sad and in need of servicing.  Easy enough job when there is no wind.  Matt had to drop the sail onto the deck in order reach all the tail tails.  You don’t want to do this in windy conditions as your jib will be flopping all over the place.  We bought a kit which made replacing them super easy.

Washdown Pump

Our Jabsco washdown pump is located in a locker near the mast.  This pump provides pressure to our hose to enable us to wash down the boat, the anchor chain and pretty much anything we need.  It is great because we can use it with salt water or fresh water depending on how the valve is turned.  We usually hose things off first with salt water, then do a final rinse with fresh water.  Why is that?  Because we have an abundance of salt water and a very limited amount of fresh water.  Our pump was very corroded as it is in and around salt water and salty air.  It worked, but it was limping along.  Instead of ‘servicing’ we decided to replace her.

The pump is only attached with a few screws and clamps.  Matt had it replaced in under an hour.

Wash down pump replacement

Wash down pump replacement

Servicing Sweetie – Our Dinghy

I had intended on putting the work done to service Sweetie on this blog, but it was so extensive that I ended up giving it her own blog post.  Stay tuned for “Dinghy Spa for Sweetie.”

Events from this blog post occurred during the month of January 2021.  Our blog posts run 8 weeks behind our adventures.

Marina Pez Vela

Sweetie Gets A Clean Bottom-Boat Chores

The yard at Marina Pez Vela is really nice.  However, as with most things that sit outside for an extended period of time, the boat gets really, really dirty.  So, in between managing our insurance claim, we have been busy working on lots boat chores.

Marina Pez Vela

Marina Pez Vela

Everything had to be removed from under our settees to enable the workers access to our house batteries, inverter/charger, COIs, and switches.  So, all of those items were moved to our master head.  In addition, the beds had to be opened up to get to the carts and bilge pumps, and cabinets had to be emptied to get to the fridge and freezer pumps.  All of that “stuff” plus our settee cushions that are normally stowed are now stuffed in other places.

It’s heartbreaking to see your home in such disarray.  So, we do what we can to keep it clean and organized as much as possible.

Before and After Photos

The salon photo below was taken “before” we put some nice artwork up behind the settees, but you get the general idea of how clean we keep our boat on a daily basis.  The bottom photo has all cushions removed, and our two sails (main and jib) in the salon.

Salon before and after photos

Salon before and after photos

The master cabin before photo was again taken before we put up our beautiful artwork.  The after shot has the bed folded up for easy access to equipment underneath.

Master cabin before and after

Master cabin before and after

I love our starboard master head because it is roomy, white, and breezy. Sometimes it is the coolest place inside the boat.  We keep it spotless because that is just how we are, but now it is stacked with stuff.

Master Head (Bathroom) before and after

Master Head (Bathroom) before and after

The port aft cabin is a office / cabin.  Typically we use this room as our “work room” so we may have some tools and our sewing projects out if we don’t have guests.  Now it is a bit of a disaster with stuff coming out of all areas.

Office / Cabin Before and After

Office / Cabin Before and After

The port forward cabin is full of our salon settee cushions

Port Forward Cabin After

Port Forward Cabin After

A few of the boat projects we have completed while on the hard….waiting.  Most of these chores or projects have been done two or three times due to the mold and constant mess from various workers.

All this work, on top of managing the insurance claim, three vendors, large budget, shipment of parts, visa renewals, extended cruising permit, Galapagos permit, and long stay visa for French Polynesia – good thing I’m a project manager.

Interior Chores:

  • Wiped down all surfaces to remove dirt, dust, mold
  • Cleaned all interior wood work and apply Howard Feed & Wax BeesWax
  • Removed mold with bleach and apply Concrobium Mold Control
  • Aired out all closets, cupboards, drawers
  • Removed silicone from ceiling panels and ceiling (access solar cables)
  • Cleaned and wipe down all bilges
  • Cleaned all areas of debris after workers left, daily

Mold grows within weeks of being clean as it rains every day here creating a great breeding environment.  So, you have to stay on top of it.

Exterior Chores:

  • Scrubbed teak hatches, sugar scoops, and swim ladder steps.  Then apply Star brite Teak Oil.
  • Restored all stainless steel by cleaning with ospho
  • Removed and replaced silicone around front & back bimini rails and around bimini port, back, starboard wood accents.
  • Cleaned up both props using muradic acid (smelly job) see photo below
Cleaning props with muradic acid

Cleaning props with muradic acid

  • Scrub both sides of all three sunshades that were covered in dirt and muck after a few months on the hard in the yard.  Had to do this twice due to the excessive dirt.
Cleaning the Sunshades

Chores: Cleaning the Sunshades

Scrubbed, sanded, and applied Star Brite Teak Oil on all exterior wood accents.

Wood accents chores

Wood accents chores

The bottom of the dinghy is always a challenge to clean.  Most cruisers will take her to a beach, flip her over and clean with sand and soapy water.  However, our outboard is so big and heavy that we cannot taker it off/on easily, so we cannot flip “Sweetie” over.

With the boat on the hard and the outboard on the stanchion, we could easily flip her over so I could clean her bottom.  This was not nearly as bad as many other dinghies we’ve seen, but this was bad for “Sweetie.”  Using a lot of elbow grease, soapy water, scrub brush and “On Off” on the fiberglass hull she came clean after 6 hours of hard labor.

Sweetie's Bottom job

Sweetie’s Bottom job

We left our helm seat cushions out for a comfortable place to sit and within a few weeks we had mold.  It rains here every day, for hours.  So, they had to be scrubbed clean before being stowed inside.  No more cushions outside.

Helm cushions moldy from rain.

Helm cushions moldy from rain.

Matt has been extremely busy as well.

  • Cleaning both engine rooms
  • Re-welded Starboard engine mount that holds alternator
  • Repaired leak in dinghy pontoon using Inland Marine’s Sealant Kit
  • Removed several ceiling panels to access solar panel wiring
  • Replaced big and small zincs on both props
  • Scrubbed down the topsides (over and over and over again)
  • Cleaned and lubed both props
  • Used ospho on stainless on the mast (since it is down and easy to reach and clean)
  • Cleaned out all storage areas.
  • Repaired two drain fittings that were leaking

Check out these clean props, freshly lubed and sporting new small and large zincs!

New Zincs on Both Props

New Zincs on Both Props

We removed our SSB plates to clean them.

Keel Coolers and SSB Plates Maintenance

Keel Coolers and SSB Plates Maintenance

Since we have been waiting to finish up this claim, we have had 5 months to do chores.  Since, I first wrote this post, we have completed more boat chores … at least we will be busy while we wait:

  • Created pattern to replace damaged ceiling panel in master state room
  • Cleaned and prepped ceiling area for new ceiling panels (three panels in master and 1 panel in office)
  • Applied VHB tape to ceiling panels and put them back up (4 months later)
  • Sewing projects: repaired wench covers, dinghy fuel tank cover, sail bag, hat.
  • Sewing project: created new sunbrella cockpit covers to keep the rain out
  • Cleaned wench handle holders
  • Repeated all projects above for Christine on Interior and Exterior before launch

New Boat Cards and Stickers

On the plus side, we did manage to create new boat cards and stickers.  We often trade boat cards with other cruisers so we can stay in touch as we travel.  These are much cleaner, with more information, and has a fabulous photo of us.

Sugar Shack Boat Cards

Sugar Shack Boat Cards

Matt created two designs for our boat stickers.  We ended up going with the top graphic with images.  Lots of places let you put your sticker up at their establishment which is fun to represent Texas.

Sugar Shack Stickers

Sugar Shack Stickers

Sugar Shack on the Hard in Marina Pez Vela.  Her boom lies across her bow, her mast is on the ground behind her and all her sails, rigging, sail bag, spreaders, etc…are down.   She desperately needs a new bottom job (even though her current one is less than 18 months young)…the elements will do that to your ablative paint.

Sugar Shack on the Hard MPV

Sugar Shack on the Hard MPV

Sweetie All Dressed Up

Our Dinghy, Sweetie, Gets a Face Lift

As a cruiser, you rely heavily on your dinghy as it is your “water car”.  The only time you don’t need your dinghy is when you are in a marina.

Our dinghy, “Sweet N Low” or “Sweetie” as she is now referred to, has been in dire need of some lovin.  We have needed to work on her for a while, but didn’t have several days in a row where she wasn’t in use.

List of ailments:

  • Rub rail was coming off
  • Velcro holding chaps was peeling off
  • Chaps needed mending (several tears, velcro, patches, and seams)
  • Slow leak, somewhere

Dinghy tubes are typically made from two types of materials: PVC or hypalon.  We have a hypalon dinghy which requires a specific type glue.  Matt found a glue used for escalators, Cement SC 2000 which is a two-step gluing agent that requires several days to cure.

Several chemicals can be used to remove this type of glue.  MEK, acetone, and mineral spirits.  They are wicked on your skin and have a pungent odor.  Several videos show you how to remove the glue as well, but they require tools that we don’t have on the boat. We had a few ounces of MEK to test in small areas.  We had less than a liter of acetone and about 3.5 liters of mineral spirits.  All three seemed to do the same thing, none better than the other.  Since we had more mineral spirits than the other two that became the solvent of choice.

My first thought was to find out where we could get more MEK or acetone so I went to Facebook.  I know, you are thinking she’s lost her marbles.  Maybe–probably,  There is a really good Facebook page for Columbia cruisers and I thought I’d ask them where to get our supplies.  I explained our project and what I was looking for and within an hour I had a reply.  Just not the reply I expected.  I was told to “never, ever ask a local Colombian for acetone as it is a key ingredient used to make cocaine.  And if I were to ask around, they would think I was part of the Pablo Escobar family.”  What the HELL!  Yikes!  Won’t go down that road.  So, we will make due with what we have on board.

Typically, we would avoid showing pornographic images on our blog, but for the sake of education, we will show you Sweetie without her chaps on.  She looks so very sad.

Note the velcro coming off both inside and outside the dinghy, the rub rail (gray & white below the velcro) is coming off and she is all around a mess.

Dinghy in repair

Sweetie’s bow with velcro coming off & rub rail on

Matt removed the rub rail with little effort and looked mournfully at the mound of glue that had to be removed from the entire circumference of the of the dinghy and the rub rail.  All that brownish yellow stuff is old glue.

Dinghy in repair

Sweetie with rub rail off and side velcro in pieces.

The port side of the dinghy had been repaired in the past using Matt’s escalator glue (it dries black) so it was a bigger mess.  Matt tackled the dinghy first while I worked on the rub rail.   We both started with the worst part of the project-the port side.

The troughs had a combination of glue, dirt, sand, and muck.  They didn’t need to be totally glue free, but the chunks had to be removed.  The two gray outer rails and the white center had to be 100% cleaned with no sticky residue as that is where the new glue would be applied.

Dinghy in repair

Rub rail being cleaned. Top cleaned, guck in crevices and bottom full of glue.

It was frustrating because it took a lot of work that garnered very little progress.  It takes a lot of patience and elbow grease.  You can see that what was once yellow is now almost white again.

Dinghy in repair

Matt finishing up removing large pieces of glue by hand.

After removing the large chunks of balls of glue, Matt used a flap wheel.  This removed the last residue of stickiness.

Dinghy repair.

Matt removing last sticky residue with flapper.

The process for the rub rail was a little different  I used a small brush and mineral spirits in a circular motion to loosen up the glue and remove the large chunks.  Then I used the scraper to remove the chunks in the troughs on either side.   Then I used a bristle pad to get the rest of the glue off.

Dinghy repair.

Cleaning the rub rail. Top cleaned, bottom not.

After the chunks were gone, I used the flap wheel to remove the last of the residue.

Dinghy repair.

Rub rail before sanding begins.

It is amazing how nice it looks once all of the old glue is off.  The flapper wheel really cleaned it up and removed the last bits of stickiness.

Matt and I talked through the gluing process several times before he mixed the compound.  We had a lot of area to cover and a limited amount of time to do it in.  First, you mix the two elements together, then you spread a light coat over the dinghy and the rub rail, and then wait an hour.  It took us 50 minutes to cover all areas with the first coat.  So we had 10 minutes to get a drink, rest, and pat ourselves on the back while the compound sat in a bowl of ice water to prevent it from curing.

The second step required us to reapply another light coat over a 3′ section (both the dinghy and rub rail or both the dinghy and velcro), wait 15 minutes until it’s tacky and then stick the pieces together.

Remember how nice it looked all clean and white – now it is all black and gooey.

We were both working with 1/2 kg can that had to cover the exterior rub rail, exterior velcro and interior velcro.  And it had to be applied to all pieces.  Did I mention that the temperature speeds up the process and hardens or cures the compound?  And did I tell you it is HOT!?

Somehow we managed to squeak every drop out of the can to cover everything we needed.  We destroyed several brushes, but it was done.

The only unfortunate thing is that we came up short on one side.  We should have started in the middle and worked our way down each side.  Either the dinghy was super inflated due to the heat or we were supposed to stretch the rub rail more to make it fit.  Too late now, we cannot start over–it is stuck on good!

3" section that came up short.

3″ section that came up short.

We let her dry overnight which gave it strength of 32 lbs per square inch.  Pretty darn strong.