Tag Archives: denray marine

Boatyard Boat Projects Before We leave

Were you wondering what Matt and I do while the Norsand boatyard crew was working hard on our repairs?  Well, you know we can’t just be idle so we finished up a few more boat projects which honestly seems like an endless list.

The cover photo is Sugar Shack at Norsand Boatyard.  Photo courtesy of Yum Yum who took it as they passed by heading up river.

Boatyard Boat Projects on the List

  • Replace Dinghy non-skid (under warranty, Aakron Express to repair)
  • Repair Anchor Chain Caddy
  • Replace (2) anchor chain rollers and several bolts at caddy (RH Precision)
  • Repair genoa North sail (random strings showing)
  • Re-Certify Life raft and (4) PFDs (Personal Floatation Device)
  • Clean and polish exterior stainless steel
  • Apply anti-foul to old/spare rudder and stow in forward bow
  • Get the Bauer Dive Compressor Working
  • Install bathroom accessories (see next blog post “Final Touches on Sugar Shack”
  • Installed a MeLE Mini PC
  • Service, Test, and Fill Propane Tank

Repairing the Non-Skid on Sweetie

The non-skid came off the floor, again, so we reached out to Aakron Express / Highfield to come out and fix it, again.  Luckily they were pretty responsive and willing to do the repairs.  I am glad this is not one of my boat projects (lots of glue/adhesive removal).

Last time they just pulled up the pieces that were coming lose and reglued them.  And surprise, surprise, they did not stick and came unglued again.  So, this time they completely removed all of the non-skid pieces, cleaned the bottom flooring and adhered new non-skid.  Let’s hope this sticks better.

I’m trying not to be annoyed that they did not replace the non-skid on the step.  As you can see it is still a little dirty which I can live with but it is a different color!  Ugh!

Bow Rollers for Anchor Chain

We took in two of our 5 bow rollers to RH Precision with the hopes of having new ones fabricated.  Rob, is truly the coolest dude ever!   He put in the specs into his CNC machine (bottom left) and showed us how they will look (purple lines).  As you can see, the bolts are way overdue for replacement so we replaced those as well.  The black will be our new roller (top left).

Rob surprised Matt by allowing him to come into the shop to assist in fabricating the rollers !  He showed him how to program the machine, figure out the math and then hit “go.”  Matt was thrilled which was so darn cute to see.

While the anchor chain caddy was taken apart, Matt decided to fix a few more things.  He added strong plastic to the inside panels which were indented from the chain, and he added chivs/spacers to prevent the bolts from rattling.

North Sail Genoa Repair

Our brand new North Sail Genoa had a few random strings (top right photo below) that worried us and it was not furling properly.  Roger from North Sails came by and collected it and we all took it to the large North Sail Loft in Auckland for repairs.

You can see how wrinkled the sail is when it is unfurled and it shouldn’t be that way (top left).  Guy at North Sails showed us what the 3Di fabric looks like when it comes apart (middle photo with black fabric and white strings) and that does not look like ours so they are “not concerned” with the random string we found.

The North sails engineers added more foam guides at the luff to help it roll better.  However, we discovered another potential problem with our forestay.  There were black marks on the luff of the genoa which usually indicates something is amiss with the forestay.  So, we bring in a rigger…more to come on this in an upcoming blog titled “Fine Tuning the Rig.”

Liferaft and PFDs

Our Viking Liferaft was due for service (every 3 years) so we took it to Denray Marine.  They inflated it, checked all seams and connection points, replaced the canister, and added some emergency supplies.  I know it looks like the liferaft is locked down, but it can easily be deployed with a single push of a button.

We also serviced 3 of our PFD’s and bought Matt a new one.

Cleaning up the Stainless

We have lots and lots of stainless on the boat.  It is one of my many jobs to keep it shiny and clean.  So, every 3 months I use super toxic chemicals such as Opsho, CLR, or Grunt to clean up the stainless.  However, our friends at Absolute Stainless turned me on to Chemico Paste Cleaner for our stainless counter tops. I thought I’d give it a try on our stainless exterior pieces and HOLY COW it worked amazing!  This will make this particular boat project a lot easier in the future.

We have stainless stanchions, turn buckles, line guards, pad eyes, and railings.  Each piece has to be meticulously cleaned and polished.  Most of the stainless just looks like it has a brown stain or spots which drives me crazy.  It’s hard to see in the sun, but trust me it looks bad.

The gates (upper left) get so corroded that they don’t easily open (this is after 3 months).

The pad eyes seem to get the worst corrosion, but they clean up nicely.

Spare Rudder

As you might recall, we replaced both of our rudders in November 2023 (as we lost one rudder).  We decided to keep the other “old” rudder as a spare (just in case), but it needed to be painted with anti-foul.   Matt sanded it down and I applied 4 coats of anti-foul paint so she is ready to go back into storage.

The spare rudder will be stowed in our forward port bow locked.  We stow a lot of stuff in here including: 15 fenders, 2 SUPs, passerelle, 2 folding chairs, 8 PFDs (personal flotation vests), 2 inflatable animals, SUP pump, ladder, and now a spare rudder.

Bauer Dive Compressor

Matt and I love to dive.  However, we have not had a dive compressor onboard to re-fill our dive tanks.  So, we either have had to find a local company or a friendly cruiser to fill our tanks or we just didn’t go diving (which was always a shame). 

We were able to buy a used Bauer Jr. Dive Compressor a few months ago despite the fact that we knew it would be a challenge to get it started.

The Bauer Jr. requires a lot of power to start up.  We purchased a soft start (an electrical device designed to gradually and smoothly control the starting and stopping of a compressor motor) to aid our Mastervolt inverter/charger (MASS COMBI 12/3000W-160A 220v) and our Honda EU20i portable generator.  Unfortunately, this did not start the dive compressor.  

We did verify that it started by plugging it into shore power.  So that is good news.  We talked at length to Mastervolt, the dive shop that sold us the soft start, and our electrician and they all said it should work – but it did not.

So, we purchased a new Honda EU32i portable Generator and a parallel cable.  Using the inverter/charger, the two generators, and the soft start the compressor finally started!  Yeah.  But we really did not want to have 2 Honda generators onboard – (imagine me smacking my face)!

Small Projects

As you might recall, we sort of blew up our Mastervolt inverter charger when we tried to start our “new to us” Bauer Jr. II dive compressor.  The good news, it was still under warranty as it was only a few months old!  So, Matt installed this new baby to give us 220 power!

We also finally received our brand new ITSEC 175m2 parasail.  I am so excited about this sail!  I cannot wait to fly her!  We love our new ISTEC Parasail (175m2) – she is gorgeous!

Bathroom Accessories

We also worked on our new bathroom accessory upgrades which are coming up in the next blog post titled “Final Touches on Sugar Shack.”  They are the prettiest toilets on the sea!

Programming

We use Synology Diskstation for a number of things including storage of our files, movies, books, and music.  But it is also used to monitor our electronics and run our music.  The problem is that Diskstation can be a bit of a power hog running at 3+ amps per hour.  When you are plugged into shore power or at a home it is not a big deal.  However, when you are making your own electricity and you have other power hungry sources, 3 amps can be huge.

So, Matt decided to try out a MeLE Mini-PC which is no bigger than a deck of cards.  It has no monitor and no keyboard.  But that is not a problem as we already have those.  It took Matt several days to program it, but it is working like a charm and only draws 1amp per hour!  Big Win.

The mini-PC will not be on the navigation table with all of those wires.  The photo was taken as Matt was programming it.  It will go below the nav station with diskstation.

Propane Tank

We have several propane tanks on the boat, for cooking and for the bbq. Our main propane tank is aluminum.  These tanks are supposed to be tested every 10 years but it is often difficult to find a place that will test them.  We had been filling this tank at El Gas for two seasons and they never said anything, until this time.  He refused to fill it until we got it tested at Firewatch.  it did not take long, but it did cost is $120NZ (we got a new valve as well).  The problem was she accidently stamped the tank as a 10lb instead of  20lb.  We did not realize it until we took it to El Gas and he had us take it back.  So she hammered out the incorrect info and restamped it.  Gesh what a pain.

There are two large boat projects that will get their own blog: Caulking the Sugar Scoop Teaks and Caulking the Sugar Scoop Teak.

As you can see we made the most of this haul out in the boatyard.  We completed a few more boat projects and are feeling good about our NZ departure.  We were anxious to get back in the water as we prepare to head to a new country, Vanuatu.

Best Seat in the House

We got the best spot in the yard!  We were parked right by the river on the corner which gave us great views and a beautiful breeze. The top photo is out our bedroom cabin window at dawn and the bottom is a shot from the bow.  It is not terrible to do boat projects when you have this view.

Our blog posts run several weeks behind actual live events.  This blog post on boat projects occurred April-May 2024.  In our last blog post we show you how to repair your teak deck – did you catch it?

Life on the Hard: Boatyard Projects

We haul out Sugar Shack at Norsand Boatyard to complete lots and lots of boat projects.  The plan was to be “on the hard” for 5-6 weeks but a lot of projects have to be done in sequential order and cannot be done simultaneously.  We started booking contractors and work back in May to ensure that we could get all of the work done and be back in the water before Christmas.  Several blog posts will come out about this journey.

Last season in New Zealand we were able to complete a lot of upgrades, maintenance jobs, repairs, and a few miscellaneous projects.  We were tied to the dock at Town Basin Marina for almost 8 months where we upgraded to lithium batteries, repaired our salon window seals, replaced our main sail and genoa, replaced our dinghy and dinghy chaps, had a new cockpit enclosure made, new interior and exterior fabric for our cushions, new ceiling panels, new LED light fixtures, and new stainless counter tops and sink.  It was a lot!  (to read more about these upgrades, search our website for the specific blog post or click on the above links.

Hauling out

Hauling out and splashing always makes my heart race.  So many things can go wrong and yet we’ve been blessed with excellent workers at each yard.  We had a late haul out because we had to wait for high tide which was 4:00pm on our scheduled date.  We arrived and found the dock empty (which evidently was not normal).  The slipway manager was busy swapping trailers and we came in a smidge early so lucky for us another cruiser met us at the jetty to grab our lines. (top photo).  I was afraid I’d have to prove my non-existent Texas skills by lassoing the pilon.

Norsand Jetty

Norsand Jetty

Kevin, the slipway manager and Shane arrive and slowly walk Sugar Shack down the slip toward the ramp.  Another two workers showed up to toss us lines for the starboard side.  Once secured, Kevin rows a dinghy out to measure the exact placement of the trailer.

They use a large tractor to push the trailer into the water.  It has to be lined up right down the center of the boat.

They expertly manuever the trailer under our boat, without incident.  Once the trailer is in place, Kevin rows his boat out again to use the trailer’s controllers to set the supports on our bulk heads (the strongest part of the boat).  It is a slow, tediuous process, but we don’t rush them.   Slow is pro!

Coming Out of the Water

Once the boat is secured onto the trailer she is slowly pulled out of the water.  

Kevin and Shane blocked us on the trailer for the night right at the top of the slipway and smack dab in the middle of the yard.  Hello Norsand, Sugar Shack has arrived!

The Projects Begin Before We Are Even Blocked

The following projects are started early the next morning, before we are moved to our parking spot.

  • Removed both rudders (the original starboard rudder and the temproary rudder)
  • Removed both props
  • Removed both saildrives (this is done by Whangarei Marine as they will service them)
  • Evaluated our vinyl/stickers with Vital Signs and he shows us how to remove them

We are moved and blocked later that afternoon.  Not sure how he is able to squeeze us in between these other two boats, but he does with no problems.

Thank Goodness We Are Not This Wide

There was a trimaran that had been in the yard for 25 months!  She had a lot of work done and was finally going back in the water.  The problem was she is too wide to go down the slipway so they have to brining  a 90-ton crane to lift her up and over into the water.  

It was remarkably fast and effecient.  The yard did a tremendous job and truly was due to the expertise of the slipway team with Kevin at the lead.  The crane arrived around 8:30am and was done by 11:30am!

Boat Yard Projects:

We have scheduled a lot of boat projects with the yard, including:

  1. Haul out / Splash
  2. Waterblast
  3. Copper coat bottom (sanding down bottom paint, applying primer & copper coat)
  4. Re-Seal the deck and hull joint around the entire boat
    • In the end, we also resealed the starboard large hatch, both helm seats & stations, both davits, the bimini.
    • We also resealed / caulked the new ceiling panels in all 3 cabins, master bath. Caulked the salon around the new counter tops & around the nav station.
  5. Gelcoat repairs
    • Below the waterline: repaired small osmosis areas, small cracks, dagger boards, and sail drive casings
    • Above the waterline: both hulls had previous repairs that no longer matched the surrounding gelcoat so we blended them better; 2 small areas at starboard bow
    • Sugar scoops: both sugar scoops around cleats, steps, and by waterline
    • Deck: Port bow filled holes from old cleat, cockpit, filled crack on hatch, both entries at sugar scoop filled holes from old barrier (water stop barriers)
    • Inside: a few of our bulk heads had small hairline cracks that we reinforced and re-glassed
  6. Wash, wax, polish
  7. Prop-speed on the props

Outside Contractor Projects: Outside of the boatyard staff:

  1. Canvas: Kim is coming back to give us phifertex side panels for the cockpit enclosure and new phifertex and sauleda window covers for the salon.
  2. Whangarei Marine removed our props and saildrives.  We are replacing the bellows, clamp rings, o-rings, and seals on both saildrives.  Huge . They also sleeved, turned, polished the wear marks on the saildrive shafts and lapped the starboard cone.  An big and expensive job.
  3. Vital Signs is replacing all of our vinyl graphics, stickers, logos on the boat.  
  4. Aakron Express is repairing our EVA/non-skid which came up on the interior floor of our dinghy
  5. RH PRecision is making our new rudder shafts, then we will take them to Alert Anodising to anodise them.
  6. New custom fit rudders are being built.
  7. Denray Marine will service our liferaft and 4 of our PFDs
  8. Nautilus Braids will provide us with new main sheets, spin halyard, reefing line, Oh $hit line (hand hold off bimini), and a roll of dynema
  9. Cleigh Ltd, Matthew Duckett will install a new 220v inverter/charger.

Matt and Christine’s Projects

  1. Remove all vinyl stickers, logos and adhesive (5+ days)
  2. Replace anchor chain markers indicating length (every 10m) and clean 100m of stainless chain (3-5 days_
  3. Install heater port heater
  4. Install 12v Inverter/charger, Matt assisted with wires, breaker, installation
  5. Varnish hand rails along cabin top, flag pole, hand holds in cockpit, helm seats, princess seats, flag pole, bimini rails (all 4 sides), princess seats, and wench handle holder
  6. Clean and polish all interior wood
  7. Polish all stainless
  8. Replace window screens
  9. Repair utensil drawer 
  10. Repair wood along aft bimini (wood glue)
  11. Repair, paint, seal starboard head ceiling (5 panels have chipped paint on fiberglass)
  12. Repair 3 steps on both both sugar scoops (teak work)
  13. Sewing projects (probably won’t get to): new fender covers, new cockpit table cover, new cockpit pockets, new recycle bags, new man over board cover, new outboard cover

As you can see we are doing a LOT of work.  And it is putting my project management skills to the test!  We are hoping to get all of this done within 5 weeks!

Stay tuned for upcoming blog posts on building new rudders, coppercoat (bottom job), vinyl stickers, gel coat repairs, and canvas work.

The cover photo is Sugar Shack after removing her stickers and her bottom paint.  That is our NZ car that we bought last season and are tooling around this season (BMW 330i with 20k miles that we bought for $3850!)  What a deal!  We will sold it for the same price after we splashed back into the water.

Our blog posts run 10-12 weeks behind actual live events.  This blog happened the 2nd week of November 2023.  Did you catch our Christmas in Whangarei blog where I bake over 800 cookies and ring the bell until it upset the Mayor?