Category Archives: Locations

Places around the world

Wai Ariki Hot Springs & Spa

 The Barkers (Matt, Diana, their kids, Matt’s parents, brother and his wife) take us on a long ride down to Roturoa to visit the very special

Prior to enjoying the facilities we are given a brief tour which starts with a beautiful prayer.

Step 1: Te Iringa Waterfall Showers

Each person passes through a series of soft waterfall streams that energise the body and open it to awareness and to the present before continuing on the cultural wellness journey.  Behind the wood screen are 4 streams that range in temperature.

Step 2:  Te Ahi Tupia Tongariro Fire and Ice Caves

In Maori wellbeing practice, it is understood that moving between extreme temperatures improves vigour and stamina.  So, this is a series of hot and cold experiences that invigorate the body and soul.

Sauna #1 is called Bio Sauna and it is bewteen 50-60 C with 40-60% humidity.  We try to stay in here for the full 15 minutes but decide to move on after 12.

We did a quick walk through the ice cold pool (top right) and then moved on to the salt sauna. This was beautiful and my favorite of the saunas.  It sat around 70-80 C with 10-20% humidity. 

Back through the ice cold pool and into the last sauna called the Hay Sauna which was 60-70 C and 10-20% humidity.  This one bothered all of us as the hay smell made us sneeze.

The next step was only for the bold and the brave.  You step into a room, pull on a chain and a bucket full of ice water flows down upon you.

Step 3: Te Taiwhanga Matua Geothermal Pools

There are five (5) geothermal pools in this area: herbal, hydrotherapy, mineral alkaline, and the cold plunge.  The pool temperatures range from 12-41C as you gently move from one to the other.  

The Geo Soal Pool was the largest and had a long ramp for easy access.  After the really hot pools this felt like bath water to me, but it was still very beautiful and restorative.

Insde the Hydrotherapy pool they have beautiful cascading waterfalls with jets in between and a set of 10 bubbling lounge beds to relax your muscles.

The Herbal Pool had little pods of floating herbs.  We found rosemary, citrus, and lemongrass. It was probably one of the prettiest spots.

Step 4: Te Pae Paru Geothermal Mud Lounge

This was fun.  You lather our body with geothermal mud to nourish the skin and connect with the land.  Once you are fully covered in mud you lay down on heated lounge chairs and let it dry before going on to Step 5.

Step 5: Kohu Wai Ariki Steam Room

Reclining on the heated lounges and stoens in this misty cave allows you to completely relax.

After a beautiful and relaxing experience at Wai Ariki Hot Springs and Spa we head back to the private and very comfortable van to Auckland.  It was so spectacular to spend time with the Barker family.   They are truly good peeps!

Our blogs run 10-12 weeks behind actual live events.  This blog post occurred at the end of December 2023.  Did you catch our wine tour at Wiaheke Island?

Waiheke Island Wine Tour

We visit Waiheke Island with our friends the Barkers (Matt, Diana, and their family).  We take a short 45-minute ferry ride from Auckland to the idyllic Waiheke island which is renowned for its vineyards nestled in beautiful settings.  It is often called “The Island of Wine.”

There are over 130-hectares (or 321 acres) of grapes and new vineyards are being planted every year.  The local winegrowers have mastered the unique maritime climate and ancient soil structures to produce red and white wines.  The first vineyard was planted in 1978, a relatively young vineyard.  Since its birth, Waiheke has made a name for its structured Chardonnay, fruity Merlot, elegant Bordeaux-style blends, and expressive Syrah – all noted as outstanding in their class.

With the Barkers we decide to visit three vineyards in our short 6-hour Waiheke Island Wine tour.  Matt and I arrived on an earlier ferry and managed to squeeze in a short hike.  Our plan is to drive to Man O’War Vineyard (purple arrow), then head back and stop at Cable Bay Vineyard (blue arrow) and our final stop is Mudbrick Vineyard (between blue and red).  The ferry dock is where the red arrow is pointing.

We start off at the furthest vineyard called Man O’War Vineyard.

Man O’War Vineyard

This was my favorite vineyard by far.  A more casual atmosphere right on the beach with loads of sitting areas, a DJ, first class wines (and beer), and food.  Man O’War is located on the far eastern side of Waiheke Island making it the most difficult to get to, but it is so worth the drive.  

This vineyard planted vines on numerous small individual sites across the volcanic hilltop and clay hillsides on their 4500-acre farm.  The wine was my favorite as was the tasty “garage beer” for the “Matts”

Cable Bay Vineyard

Guests enjoy breathtaking sea views while sipping on award winning wines from Cable Bay Vineyard.  But, unfortunately, we only had an hour to explore here so one glass of rose.  The grounds are beautiful and they grow their own herbs, vegetables, and edible flowers for their restaurants and bars. 

Mudbrick Vineyard

Located right next door to Cable Bay Vineyard on Waiheke island is Mudbrick Vineyard. It is world-renowned for it superb restaurants, award-winning wines and spectacular sea views.  They claim to offer the perfect Waiheke experience with their beautiful accomodations, tours, and wine tastings.  NY Times said “Mudbrick is a must see when visiting Auckland.”  Which is kind of funny to me as Mudbrick is on Waiheke island a 45 minute ferry ride from Auckland.

Mudbrick offered a lovely wine tasting!  Shockingly, I really enjoyed the sauvignon blanc over the rose.

A beautiful shot of Auckland from the Sky Tower and from the Ferry on the way to Waiheke Island.  While on the ferry we swung by the Navy station which has the largest of NZ fleets of boats.

Our blog posts run 10-12 weeks behind actual live events.  This blog post occurred toward the end of December 2023.  In our last blog we replace our shattered Moonlight Hatch Frames.

Shattered Moonlight Hatch Frames

We have lots and lots of windows on Sugar Shack.  Some are called “windows” and some are called “hatches.”  Windows typically do not open whereas a hatch opens.  Moonlight manufactures most of the hatches and many varieties of boats use them including us.

We have two escape hatches on our boat which we could use in the event of an emergency.  There is one on starboard in the master head (bathroom) and one on port in the forward cabin.  They provide excellent ventillation for the boat and are almost always open when we are not underway.  We love them!  

We also have 4 large hatches: (2) for the engine compartments and (2) for the bow lockers. These 6 Moonlight hatch frames come in multiple parts.  The top part of the frame is aluminum and holds the actual frame that opens and closes.  The bottom part of the frame is plastic and it is really just to cover the screws and make everything look pretty.

We have a total of 6 Moonlight hatch frames that are damaged, broken, cracked, and yellowed.  It has bothered Matt and I for years.  But, the replacement plastic frames are flimsy.  We have waited to find a better solution for replacing them and thought we had the perfect plan while we were at Norsand Boat yard.

We had hoped the yard could make a mold and build new ones out of fiberglass.  Unfortunately that did not work out.  It was going to take a really long time and cost close to a $1000NZD for just the two escape hatch frames.  So, we ended up buying all 6 Moonlight plastic frames from AB Marine for $1500USD (including shipping from Germany to NZ).

Moonlight Hatch Frames

The wear and tear on these plastic frames is very common.  We have met several other cruisers who have had similar problems with their frames.  I mean really, they are flimsy plastic and 23 years old after all.   Here is a photo of our old frame and the new frame (prior to cutting out the back).  This is the escape hatch in the master head.

The damage is extensive and none of the frames are salvageable.  Here are the escape hatches (inside).

The two frames on the bow hatches are almost completely gone – you can hardly see the plastic.  In fact on the top photo, Matt put wood in to avoid having the sails torn by the broken plastic and exposed screw heads.  But you can still see bits of the yellow plastic frame between the wood and the metal frame.

The sorry state of our bow peak Moonlight hatch frames.

The sorry state of our bow peak Moonlight hatch frames.

The two engine compartment hatch frames are not any better — either completely missing or shattered.

After posting these photos I realize how appalling their state truly is now!  How did we live with them like this for so long?

New Moonlight Hatch Frames

We ordered 6 Moonlight frames from AB Marine.  They safely packaged our very fragile frames and sent them to NZ for us.  We received them within 9 business days from Germany.  It was a rather large box.

We decided to see if we could strengthen the plastic frames prior to installing them.  Our hope was that we could fiberglass the back edges and insert foam in the empty spaces to create a more stable glueing platform.  However, after we removed the old frames we realized that only the starboard escape hatch has room for fiberglass. The port frame has no room – not even 1mm.  The two bow peaks can be fiberglassed but the two engine compartment hatches don’t have room either.

Top photo shows how tight the space is where the frame has to slip into (between the existing gray fiberglass and the gray metal).  The bottom photo shows the huge gaps that need a foam filler in addition to fiberglass around the frame.

Preparations

First the removal process begins.  Of course it is a messy job as the plastic crumbles easily.

Once the plastic is all removed we have to start taking off the 5200 super glue (or as Matt calls it the Devil’s glue) and the sealant.  It is a slow process…

Hatch surrounds are cleaned up.  Left photos with glue and right photos clean (hopefully you can tell without my description).

The (4) larger hatches are more difficult because we have to pick out the old plastic and old adhesive between the metal frame and the fiberglass.  We use picks, pudy knives, and exacto knives to get it all out.  

Fiberglassing the Frames

It is time to fiberglass (or glass as it is known in the industry) the 3 frames that have room to glass.  We bring 1 escape hatch frame and 2 bow peak frames into Norsand so Peter Palmer can glass them for us.  He is so sweet and did this over the holidays so we did not have to wait the 2 weeks for the yard to reopen after the Christmas holidays.  We only glassed the backside as we did not want it to show on the front side.

While Peter was glassing the three pieces, Matt filled in the starboard escape hatch frame so that it would provide better support.  The port escape hatch had already been filled in but the starboard one had huge gaps which left the frame unsupported.

Before we install, Matt had to cut the plastic frames to fit each area.  He started with the starboard engine hatch.  He measured, taped the frame, measured again, and then measured a third time just to be sure.  Then with an exacto knife he slowly cut the plastic frames.

The frames that have fiberglass had to be cut using an angle grinder at Norsand.  Once the fiberglass was done it made it nearly impossible to cut so we borrowed a protected room at the Norsand Boatyard and used an angle grinder to cut through the fiberglass.  It made a bit of a mess, but we got it done.

Ready to Install

Now that the frames and the surrounds are ready, we can start the install.  Here are a few photos of the larger hatches after the glue was removed and before the frames go in.  You can see the nasty screws that stick out.  It makes it really easy to hurt your head or shoulder and it opens it up for the possibility of damaging our sails and other items stored in these comparments.

Matt decided he did not want to use 5200 (the Devil’s glue) for the adhesion.  We spoke to several people at Norsand and decided to use Dow Dowsil 795 Structural Glazing Sealant with a few spots of 5200 to adhere the frames to the surrounds.  This will make it substantially easier to remove them in the future.  He loads the frames and surrounds with glue and then we carefully raise the frames into place before taping and locking them in.

We leave large clamps and tape on for 24 hours.  Then we remove the clamps and leave the tape on for another 48 hours.  Just to ensure it has plenty of time to dry and set.

The finished and installed frame looking gorgeous!

Now, just 5 more to go….

Our blog posts run 10-12 weeks behind actual live events.  This particular blog post occured over the 2023-2024 holiday break.  In our last blog we update a few more canvas pieces including new window covers and sun shades.