Category Archives: Boat Details

Sweetie All Dressed Up

Our Dinghy, Sweetie, Gets a Face Lift

As a cruiser, you rely heavily on your dinghy as it is your “water car”.  The only time you don’t need your dinghy is when you are in a marina.

Our dinghy, “Sweet N Low” or “Sweetie” as she is now referred to, has been in dire need of some lovin.  We have needed to work on her for a while, but didn’t have several days in a row where she wasn’t in use.

List of ailments:

  • Rub rail was coming off
  • Velcro holding chaps was peeling off
  • Chaps needed mending (several tears, velcro, patches, and seams)
  • Slow leak, somewhere

Dinghy tubes are typically made from two types of materials: PVC or hypalon.  We have a hypalon dinghy which requires a specific type glue.  Matt found a glue used for escalators, Cement SC 2000 which is a two-step gluing agent that requires several days to cure.

Several chemicals can be used to remove this type of glue.  MEK, acetone, and mineral spirits.  They are wicked on your skin and have a pungent odor.  Several videos show you how to remove the glue as well, but they require tools that we don’t have on the boat. We had a few ounces of MEK to test in small areas.  We had less than a liter of acetone and about 3.5 liters of mineral spirits.  All three seemed to do the same thing, none better than the other.  Since we had more mineral spirits than the other two that became the solvent of choice.

My first thought was to find out where we could get more MEK or acetone so I went to Facebook.  I know, you are thinking she’s lost her marbles.  Maybe–probably,  There is a really good Facebook page for Columbia cruisers and I thought I’d ask them where to get our supplies.  I explained our project and what I was looking for and within an hour I had a reply.  Just not the reply I expected.  I was told to “never, ever ask a local Colombian for acetone as it is a key ingredient used to make cocaine.  And if I were to ask around, they would think I was part of the Pablo Escobar family.”  What the HELL!  Yikes!  Won’t go down that road.  So, we will make due with what we have on board.

Typically, we would avoid showing pornographic images on our blog, but for the sake of education, we will show you Sweetie without her chaps on.  She looks so very sad.

Note the velcro coming off both inside and outside the dinghy, the rub rail (gray & white below the velcro) is coming off and she is all around a mess.

Dinghy in repair

Sweetie’s bow with velcro coming off & rub rail on

Matt removed the rub rail with little effort and looked mournfully at the mound of glue that had to be removed from the entire circumference of the of the dinghy and the rub rail.  All that brownish yellow stuff is old glue.

Dinghy in repair

Sweetie with rub rail off and side velcro in pieces.

The port side of the dinghy had been repaired in the past using Matt’s escalator glue (it dries black) so it was a bigger mess.  Matt tackled the dinghy first while I worked on the rub rail.   We both started with the worst part of the project-the port side.

The troughs had a combination of glue, dirt, sand, and muck.  They didn’t need to be totally glue free, but the chunks had to be removed.  The two gray outer rails and the white center had to be 100% cleaned with no sticky residue as that is where the new glue would be applied.

Dinghy in repair

Rub rail being cleaned. Top cleaned, guck in crevices and bottom full of glue.

It was frustrating because it took a lot of work that garnered very little progress.  It takes a lot of patience and elbow grease.  You can see that what was once yellow is now almost white again.

Dinghy in repair

Matt finishing up removing large pieces of glue by hand.

After removing the large chunks of balls of glue, Matt used a flap wheel.  This removed the last residue of stickiness.

Dinghy repair.

Matt removing last sticky residue with flapper.

The process for the rub rail was a little different  I used a small brush and mineral spirits in a circular motion to loosen up the glue and remove the large chunks.  Then I used the scraper to remove the chunks in the troughs on either side.   Then I used a bristle pad to get the rest of the glue off.

Dinghy repair.

Cleaning the rub rail. Top cleaned, bottom not.

After the chunks were gone, I used the flap wheel to remove the last of the residue.

Dinghy repair.

Rub rail before sanding begins.

It is amazing how nice it looks once all of the old glue is off.  The flapper wheel really cleaned it up and removed the last bits of stickiness.

Matt and I talked through the gluing process several times before he mixed the compound.  We had a lot of area to cover and a limited amount of time to do it in.  First, you mix the two elements together, then you spread a light coat over the dinghy and the rub rail, and then wait an hour.  It took us 50 minutes to cover all areas with the first coat.  So we had 10 minutes to get a drink, rest, and pat ourselves on the back while the compound sat in a bowl of ice water to prevent it from curing.

The second step required us to reapply another light coat over a 3′ section (both the dinghy and rub rail or both the dinghy and velcro), wait 15 minutes until it’s tacky and then stick the pieces together.

Remember how nice it looked all clean and white – now it is all black and gooey.

We were both working with 1/2 kg can that had to cover the exterior rub rail, exterior velcro and interior velcro.  And it had to be applied to all pieces.  Did I mention that the temperature speeds up the process and hardens or cures the compound?  And did I tell you it is HOT!?

Somehow we managed to squeak every drop out of the can to cover everything we needed.  We destroyed several brushes, but it was done.

The only unfortunate thing is that we came up short on one side.  We should have started in the middle and worked our way down each side.  Either the dinghy was super inflated due to the heat or we were supposed to stretch the rub rail more to make it fit.  Too late now, we cannot start over–it is stuck on good!

3" section that came up short.

3″ section that came up short.

We let her dry overnight which gave it strength of 32 lbs per square inch.  Pretty darn strong.

A Cartagena Fort, Castle, and Bastion

The Walled City is a giant fort in and of itself.  The construction of the Walls of Cartagena lasted nearly two centuries, ending in 1796. The historic center is complemented by fortifications and bastions, where you can watch sunsets.  The Walled City being the largest Cartagena Fort.

In addition to the 7 miles of stone walls that make up the Walled City, you can also visit other forts.  Matt and I had fun exploring several of them.

One of the largest structures built in Columbia is Castillo San Felipe de Barajas which is a World Heritage Site.  San Felipe de Barajas castle was the only access to the city from the mainland.  Not sure if a castle constitutes a Cartagena Fort, but just go with it.

We arrived at the Walled City just as a tourist bus unloaded its passengers.  Drat!  We bought our 15,000 peso tickets and scurried up the hill to get in front of the crowds.  Most of the people were not the “scurrying” type so we had some time to explore on our own.  This was a very large castle.  It just kept going and going and going.  We were able to stand on the walls, check out the bastions, and go on a quest underground.  They opened up several underground tunnels where we believed the soldiers slept.  We were not sure as we did not buy headphones or go on an official tour.

Images: Matt inside a bastion, me next to one, shot between the walls. Matt in a tunnel, fort walls with modern city in back.

Castillo San Felipe de Barajas. Cartagena Fort.

Castillo San Felipe de Barajas

Images: Fort entrance, me with a pretty view, me locked up, sleeping quarters, and wall exterior.

Castillo San Felipe de Barajas. Cartagena Fort

Castillo San Felipe de Barajas

As we were coming out of one of the tunnels, a tour group was at the entrance. The guide was showing how they built the tunnels in such a way to always protect them from intruders.  He joked, in English, that we were pirates so when we came out, I said “Argh, give me all of your money” which garnered muzzled laughs.

On the far end of the Walled City, we discovered a construction zone.  They are building an huge entertainment area.  New restaurants, bars, shops, and an enormous round outdoor theater are being built.  I sure wish we could see this completed – what a hoot it would be to see a play here!

Cartagena Fort. Round Theater

Round theater being built above and image of completed project below.

The Baluarte El Reducto is part of the walls of the Historic Center of Cartagena.  It is a fortification bastion facing the lagoon of San Lazaro.  It was the first work of fortification enclosure built as a result of the enlargement of the city.  On top of the fort is Casa Cerveza, a restaurant that has a beautiful view and a great name!  Who wouldn’t want to live in a Beer House?  (Casa Cerveza=Beer House)

View from Casa Cerveza.

View from Casa Cerveza.

EL fuerte de San Sebastian del Pastelillo is where Club de Pesca is located which is one of the 5 marinas in Cartagena.  Even though there is not much left of the fort, it makes for an impressive entrance to the marina.  I can imagine you’d feel safe keeping your boat within Cartagena Fort waters.

Fuerte Sansebastian

We visited several bastions:

  • Baluarte Santa Catalina
  • Baluarte San Pedro Martir
  • Convento de San Diego

Walking around town we found this cool world map

World Map - where are we?

World Map – where are we?

End to a perfect day – Matt and Teo

Matt and Teo walking and talking.

Matt and Teo walking and talking. Photo credit: Jon Wright

Light It Up Sparky – Alternator Issue

Sugar Shack has four alternators on board, two for each engine.  The small alternator charges the starter battery and the large one charges the house batteries. One of our large, 130 amp Mastervolt alternators has “issues” and it was time to fix it.  Matt had already taken it a part, cleaned the brushes, and tweaked things, but it still wasn’t working.  He suspected it needed new diodes which we did not have on board.  He found a place called “Marlon’s Garage” in Aruba that had good reviews for rebuilding alternators.

 

Matt pulled the big boy out of the engine, placed it in a plastic bag and we hefted it to Marlon’s Garage.  When I say “we” I mean “he” by the way.  We scouted the location earlier so we didn’t have to walk around carrying a 40 lb bag.  The garage was nice, clean, and stocked with a variety of vehicles in 15-20 bays.  All of the employees had really nice embroidered shirts with “Marlon’s Garage” on the back and their names on the front.  Surprising since these are mechanics working around dirty cars and parts wearing these expensive shirts – but good branding!

The garage was filled with lots of treasures.  The owner, a lifelong car enthusiast, had a few Ferrari’s, a porche, couple of corvettes, classic mustang, and old caddy.  We later discovered that he has over 50 cars in total and he is still collecting.

We walked in and they immediately took the alternator in to be tested.  They determined that we needed new diodes and possibly a new rectifier but they could easily do the repair.  They asked us to check back just before 12 to see when we could pick it up.  We left an $80 deposit and went on our way.

We met our friends Dave and Tanya on “Dea Latis” and headed to Price Smart to load up with some groceries.  Half way through our shopping, I realized it was almost 12 so I went outside to try to call. After several failed attempts I went back inside and finished shopping.  Matt kept trying but it was a bad connection.  However, Matt was able to determine that our alternator would be ready before closing.  We returned our fresh groceries to the boat and decided to explore the town while we waited for the repair to be completed.

Around 5p we headed back to Marlon’s Garage to pick up our alternator.  All three diodes were replaced. The shop did not have a rectifier so they actually fabricated a new one for us.  All for the low price of $130.

We loaded her back up into her plastic and headed back toward the dinghy dock.  It was hot, with little to no breeze and we were both exhausted.  A cold beverage would perk us up!  We stopped in on a local bar to regroup.  After we addressed our more pressing needs by cooling down and resting, we realized we were famished.  We left after two rounds and stopped at a Cuban place by the marina.  It was really lovely, with a band, nice ambiance, and super tasty food.  28k steps later, we crashed hard!

Matt installed the rebuilt alternator the next day and was pleasantly surprised to find that it charged at 30-40 amps while the engines were in idle.  The other alternator charges at 10-15 amps at idle.  Then he pushed the engine to 1500 RPM it charged at 100 amps.   Whereas the other one charges at 30-40 amps at 1500 RPM.  Wow, this is amazing!

He was so excited that he took the other 130 amp alternator off and said let’s go have this one checked too.  We huffed back to Marlon’s, had them check it and they said it was fine. They suggested that the regulator might need to be tweaked.  Humf…Matt had checked that it was still not putting out the same amps as the rebuilt one, but it was still charging the house batteries.

The good news is that both large alternators are charging the house batteries.  Yeah.